- We must have TWO digital images ready for Thursday 17th between 10am-12.30pm
(one image should be the work in situ, and the other should be a strong image of the work, or a video)
- Blog deadline Friday 18th.
- We need to make a context sheet, showing a flavour of your contextual references, materials and inspiration- this needs to be put onto the blog by Friday.
- There is a digital session tomorrow if anyone needs help, with Mary Stark.
- ALL leftover work needs to be cleared out of the studio by Friday 18th.
- Our screening will be on 28th May.
- Wearing it has a screening at MOSI on 24th May- 7-9pm.
- Imagining it has a private exhibition at Hostpur House on 25th May.
- There will also be a launch party on 23rd May
(not too sure when and where)
We also had a talk from Fiona Curran, which i'll show in a different post!
Thanks Alisa!
ReplyDeleteAre these 2 digital images that need to be done by thursday images of your installation, hanging, whatever, in or on the actual building, or just digital work you'v done?
ReplyDeleteOne needs to be of your work in situ, so in a space that could look like it's from the building etc, then the second one just a strong image, so could be of a sample or something
ReplyDelete